Back. These days, we are having sleepless nights (and sleeping days). =) Tight schedule. Many things to do.
- Must finish the product (Musikr Interactive Music Billboard) by coming thursday.
- After that comes final report for the project.
- Dance performance for Myanmar Tradition Show 2007 must all be ready by coming 28. (The event is on 5th of August. 28 is first full-rehearsal.)
- Arrange costume for those performers.
Hope everything just goes fine. Will be back soon. =)
Peace:
mgthantzin
